FEM STUDY · v1.0
The Failed 51-Case DOE, Perzyna Gate Tests and Solver-Chain Repair (FEM-PRESET S11)
Why did the large parameter search (DOE) fail mid-run? How was the solver chain repaired to batch readiness - and what must be checked before any future batch? Evidence level H0 (historical reconstruction / method validation / parameter screening); no material calibration or production approval is claimed. Full member PDF: 16 pages.
Purpose
Solver / version
Material model
Boundary conditions
Applicability
Contact / friction
Mesh / convergence
A-L / manufacturer / FEM / experiment at equal displacement
| Displacement mm | A-L N | Manufacturer N | FEM N | Experiment N | FEM vs A-L |
|---|
Complete engineering data
Raw files and detailed reports require registration and sales approval.